Oil Rig: Difference between revisions
Content added Content deleted
mNo edit summary |
mNo edit summary |
||
Line 13: | Line 13: | ||
==History== |
==History== |
||
===Minor Upgrades=== |
===Minor Upgrades=== |
||
[[File:OilRig6.png|200px|thumb|right|The mid-section.]] |
|||
The oil rig received some minor upgrades on 16-17 September 2022. The buildings on top of the rig was given interior and proper stairs, and a large mid-section was dug out leading down to the water. According to 44cckw, a massive drill is being planned to be built, but nothing has currently materialized. |
The oil rig received some minor upgrades on 16-17 September 2022. The buildings on top of the rig was given interior and proper stairs, and a large mid-section was dug out leading down to the water. According to 44cckw, a massive drill is being planned to be built, but nothing has currently materialized. |
||
Revision as of 05:53, 17 September 2022
Oil Rig | |
---|---|
Owner | 44cckw (oil rig) Norbert011 (helicopter) |
Builders | Unknown |
Construction | |
Location | |
The Oil Rig is a massive oil rig, located in the waters outside of Oak Hills and Paris.
History
Minor Upgrades
The oil rig received some minor upgrades on 16-17 September 2022. The buildings on top of the rig was given interior and proper stairs, and a large mid-section was dug out leading down to the water. According to 44cckw, a massive drill is being planned to be built, but nothing has currently materialized.
Gallery
-
The waters outside Oak Hills, before the construction of the oil rig. 11th March, 2022.
-
The Oil Rig under construction. 24th March, 2022.
-
Ditto. 25th March, 2022.
-
The Oil Rig itself is finished. 25th March, 2022.
-
The Helicopter is built. Containers are added to the oil rig. 26th March, 2022.
-
View of the oil rig. 28th March, 2022.